Submitted by Naresh Kapoor, AF-Mercados EMI

This work has been developed as part of the “Review of the present distribution network/infrastructure and preparation of roadmap for increasing the quality of power supply with economic consideration with a special focus on how to provide reliable power to good commercial markets”.
The mission was started in May 2019. The Consultant conducted AS-IS study, collected technical data and had series of meetings with the technical staff of four representative DisCos. The Consultant also visited few transmission substations to understand the layout and challenges. The Consultant also visited 33/11KV substations, and 33 and 11KV network of respective DisCos. The entire project was divided into four parts and the last site visit was performed from 24th November to 10th December 2019.

Click here for full report.

20200304-MI1748-Draft-final-Report-NRQoS_compressed